Relevant decoration knowledge of shower room: what aspects should be paid attention to in bathroom decoration
Overall, decoration is a very troublesome thing. Getting into trouble step by step, always ready to be deceived, quarreling, and unhappiness abound. There are many regrets. Perfection is impossible, mistakes can only be minimized. Everyone's situation is different, let me talk about my decoration experience for reference.
1. Ceiling: As the water vapor in the bathroom is very heavy, please choose materials with waterproof, anti-corrosion and anti-rust properties.
Second, the ground: before laying the floor tiles, be sure to do a good job of waterproofing; after laying the tiles, make sure that the surface of the tiles has a drainage slope (usually about 1%), and the slope faces the ground drain; after laying the tiles, the ground must be laid. it is good. For the watertight experiment, the time must be at least 24 hours; when laying floor tiles, please pay attention to the joints and alignment of the wall tiles to ensure the overall feel of the entire bathroom, so as not to create a messy visual impression.
Third, the wall: wall tiles should also be moisture-proof and waterproof, and ensure that the wall is flat, and the joints and alignment of the joints and the floor tiles should ensure the overall feeling of the wall and the ground; if they touch the outlet of the water supply pipe, the tiles The cutout should be small and appropriate so that the flange cover on the water dispenser can cover the cutout, so that the appearance is perfect.
Four. Doors and windows: It is best to have windows in the bathroom to facilitate ventilation; if there are no windows, please pay special attention to the details of the door. In order to prevent water in the bathroom from overflowing, the border of the door should be slightly higher than the inside of the bathroom; between the door and the bathroom floor The gap should be kept larger to facilitate return air. If it is a sliding door, the sliding door and the bathroom form a waterproof layer between the floor tiles.
Fifth, laying the circuit: the wire joints in the bathroom must be hung with tin and wrapped with waterproof tape and insulating tape to ensure safety; the wire body must be covered with a flame-retardant tube; all switches and sockets must have moisture-proof boxes, and their location also depends on Based on the size and location of the equipment to ensure the convenience and rationality of use.
Sixth, waterway renovation: It is best not to make too many changes to the bathroom's water supply and drain lines. If you want to change it, it should be determined according to the specific situation. For example, depending on the model of the washing machine, the location of the upper and lower water is also different.
Seven installation of sanitary ware: It is best to remember the distance of the drain hole before decoration, and choose the bathtub, bathroom, toilet, wash basin and other sanitary wares according to the size, so as to avoid inappropriate installation during the decoration period, the toilet must first be installed and the toilet mud is well sealed and then used Fix it with expansion screws or glass glue so that it is easy to repair when the toilet is blocked.
The above is all the contents shared by the shower room manufacturer Martha shower room.